| Control Identifier | CP-7(6) |
| Latest Sync Date | 19/12/24 09:18:14 |
| Discussion | There may be situations that preclude an organization from returning to the primary processing site such as if a natural disaster (e.g., flood or a hurricane) damaged or destroyed a facility and it was determined that rebuilding in the same location was not prudent. |
| Related Controls | None. |